The exterior appears to be ready for an application of stucco (the usual cladding around here). The interior door goes from the master bedroom to the back patio. Blinds are located between glass panes in the doors.
Roof shingles are being installed. Plumbing supply and drains are installed and being pressure tested. Electric outlets locations have been identified. Extra concrete forms have been placed.
It's getting warm here, but that does not seem to have slowed the builder down. The Framing is now about 95% complete; which is approximately 3 days ahead of the schedule. I certainly hope that this trend continues.