Sunday, May 27, 2007

5/27/07 Update


The stucco is installed .

Saturday, May 26, 2007

05/25/07 Update




The exterior appears to be ready for an application of stucco (the usual cladding around here). The interior door goes from the master bedroom to the back patio. Blinds are located between glass panes in the doors.




Tuesday, May 22, 2007

05/22/07 Update


Now there are concrete driveway and walkways as well as doors!

Saturday, May 19, 2007

05/19/07 update


Roof is complete. Ductwork is installed. Concrete for driveway and walkways should be next.


Wednesday, May 16, 2007

House Update 5/16/07


Roof shingles are being installed. Plumbing supply and drains are installed and being pressure tested. Electric outlets locations have been identified. Extra concrete forms have been placed.

Sunday, May 13, 2007

5/12/07 Update


Latest picture shows pre-stucco cladding and windows .


Wednesday, May 09, 2007

House Update 05/08/07


Two months (approximately) to go and the roof shell is being installed. Electric and plumbing is not far behind.


Saturday, May 05, 2007

Update 05/04/07




Progress is continuing. Today they were at the point of installing the roof trusses.

Thursday, May 03, 2007

Update 5/2/07


It's getting warm here, but that does not seem to have slowed the builder down. The Framing is now about 95% complete; which is approximately 3 days ahead of the schedule. I certainly hope that this trend continues.

Tuesday, May 01, 2007

House update 4/30/07


Framing has begun. Three outer walls and a few inner ones are up.